STEREO Weekly Meeting Minutes for 2009-02-17 (Week 08) ANNOUNCEMENTS ------------- * None. INSTRUMENT AND SPACECRAFT STATUS -------------------------------- * All subsystems on both spacecraft are nominal, except that the Ahead spacecraft is currently operating on IMU #2. DISCUSSION AND OPERATIONS CONSTRAINTS ------------------------------------- Week 07 * Telemetry lock was intermittent for both Ahead using station 54 on day 45 resulting in a small loss of SECCHI data for days 44 and 45. * Behind had some small data losses for all instruments on day 43 caused by a combination of track time shift and some intermittent outages at station 24. * The average daily downlink was 6.4 gigabits on Ahead, and 7.0 gigabits on Behind. Week 08 * Behind performed a SECCHI step cal on day 48 to get better background values for COR-1 * PLASTIC will adjust Ahead high voltages on day 48 Week 09 * No significant activities planned. Week 10 * No significant activities planned. Other * The scripts for the SECCHI HI team request to roll each spacecraft by 180 degrees for 6 hours to examine the L4 and L5 points as the spacecraft approaches them is about to be tested on the simulator. COORDINATED OBSERVATIONS ------------------------ ------------------------------------------------------------------------------- Scheduled activities for Week 08: M Feb 16 (047) T Feb 17 (048) Behind: SECCHI stepped calibration roll, 13:00 DAWN - Mars fly-by W Feb 18 (049) Ahead: PLASTIC hi voltage adjustment T Feb 19 (050) F Feb 20 (051) S Feb 21 (052) S Feb 22 (053) ------------------------------------------------------------------------------- Scheduled activities for Week 09: M Feb 23 (054) T Feb 24 (055) W Feb 25 (056) T Feb 26 (057) F Feb 27 (058) S Feb 28 (059) S Mar 01 (060) ------------------------------------------------------------------------------- Scheduled activities for Week 10: M Mar 02 (061) T Mar 03 (062) W Mar 04 (063) T Mar 05 (064) F Mar 06 (065) S Mar 07 (066) S Mar 08 (067) ------------------------------------------------------------------------------- Upcoming events: 2009: ICAL-001: Jan 26-30, Mar 2-6, Apr 6-10, May 11-22, Jun 15-19, Jul 13-17 SECCHI Stepped calibration rolls Ahead: Mar 10, Jun 9, Sep 2, Nov 24 Behind: Apr 7, Jun 16, Sep 22, Dec 22 * Mar 9 (TBC) ICAL14, Herschel sounding rocket launch http://sohowww.nascom.nasa.gov/soc/JOPs/ical014-draft.pdf * Mar 27, Apr 2 JOP 80, EIT shutterless * Apr 15-29 SUMER campaign (TBC), JOPS 210,211,212,214 * Apr 16 SUMI sounding rocket launch http://adsabs.harvard.edu/abs/2008AGUSMSP51B..01A * May 11 Both: Begin 6 hour daily DSN tracks * May 18 Ahead: Switch downlink rate to 360 kbps * Jun 1-Jul 10 Sunrise 5-day balloon flight http://star.mpae.gwdg.de/Sunrise/project/publicat/SPIE_2004.pdf * Jun 8 Behind: Switch downlink rate to 360 kbps * Jul 1 Both: HGA calibration * Jul 22 Total solar eclipse http://eclipse.gsfc.nasa.gov/SEmono/TSE2009/TSE2009.html * Aug 3 Both: Begin 7 hour daily DSN tracks * Aug 10 Ahead: Switch downlink rate to 240 kbps * Aug 31 Behind: Switch downlink rate to 240 kbps * Sep 10 Ahead at L4 Lagrange point * Sep 29 Messenger - Mercury fly-by * Oct 26 Behind at L5 Lagrange point * Nov 1-Dec 15 SUMER campaign (TBC) * Dec 7 Behind: Begin 8 hour daily DSN tracks * Dec 14 Behind: Switch downlink rate to 160 kbps 2010: SECCHI Stepped calibration rolls Ahead: Feb 23, May 18, Aug 10, Nov 2 Behind: Apr 6, Jul 13, Oct 12 * Jan 6 Both: HGA calibration * Apr 19 Ahead: Begin 8 hour daily DSN tracks * Apr 26 Ahead: Switch downlink rate to 160 kbps * Jul 11 Total solar eclipse http://eclipse.gsfc.nasa.gov/SEmono/TSE2010/TSE2010.html * Jul 14 Both: HGA calibration * Nov 15 Behind: Switch downlink rate to 120 kbps 2011: * Jan 12 Both: HGA calibration * Mar 18 Messenger - Mercury orbital insertion * Apr 11 Ahead: Switch downlink rate to 120 kbps * Jul 13 Both: HGA calibration * Aug DAWN - Vesta arrival * Sep 19 Behind: Switch downlink rate to 96 kbps * Sep 26 Ahead: Switch downlink rate to 96 kbps 2012: * Jan 11 Both: HGA calibration * May DAWN - Vesta departure * Jul 11 Both: HGA calibration * Aug Both: Switch downlink rate to 30 kbps 2013: 2014: 2015: * Feb DAWN - Ceres arrival * Jan 10 - Apr 12 Behind: Spacecraft behind Sun * Feb 17 - Aug 2 Ahead: Spacecraft behind Sun * Jul 23 - Nov 10 Behind: Spacecraft behind Sun * Jul DAWN - End of nominal mission