Scheduled activities for Week 01:

M Dec 31 (366)  
T Jan 01 (001)  New Year
W Jan 02 (002)  
T Jan 03 (003)  
F Jan 04 (004)  
S Jan 05 (005)  
S Jan 06 (006)  

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 02:

M Jan 07 (007)  
T Jan 08 (008)  
W Jan 09 (009)  Ahead:  HGA calibration, 18:00 UT
T Jan 10 (010)  Behind: HGA calibration, 21:00 UT
F Jan 11 (011)  Ahead:  Momentum dump, 18:00 UT
S Jan 12 (012)  
S Jan 13 (013)  

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 03:

M Jan 14 (014)  
T Jan 15 (015)  
W Jan 16 (016)  
T Jan 17 (017)  
F Jan 18 (018)  
S Jan 19 (019)  
S Jan 20 (020)  

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 04:

M Jan 21 (021)  
T Jan 22 (022)  
W Jan 23 (023)  
T Jan 24 (024)  
F Jan 25 (025)  
S Jan 26 (026)  
S Jan 27 (027)  

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 05:

M Jan 28 (028)  Behind:  Momentum dump, 17:15 UT
T Jan 29 (029)  
W Jan 30 (030)  
T Jan 31 (031)  
F Feb 01 (032)  
S Feb 02 (033)  
S Feb 03 (034)  

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 06:

M Feb 04 (035)  
T Feb 05 (036)  
W Feb 06 (037)  
T Feb 07 (038)  Behind: SWx beacon Turbo test 18:30-20:30
F Feb 08 (039)  
S Feb 09 (040)  
S Feb 10 (041)  

Notes:

* Significant telemetry shortfalls for the Behind spacecraft are expected
  during the week.

-------------------------------------------------------------------------------
Scheduled activities for Week 07:

M Feb 11 (042)  
T Feb 12 (043)  
W Feb 13 (044)  
T Feb 14 (045)  
F Feb 15 (046)  
S Feb 16 (047)  
S Feb 17 (048)  

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 08:

M Feb 18 (049)  Ahead:	Momentum dump, 19:00 UT
T Feb 19 (050)  Behind: Momentum dump, 17:00 UT
W Feb 20 (051)  
T Feb 21 (052)  
F Feb 22 (053)  
S Feb 23 (054)  
S Feb 24 (055)  

-------------------------------------------------------------------------------
Scheduled activities for Week 09:

M Feb 25 (056)  
T Feb 26 (057)  Ahead:	Space weather Turbo test, starting 10:44 UT
W Feb 27 (058)  Ahead:	Space weather Turbo test, ending 16:35 UT
T Feb 28 (059)  
F Mar 01 (060)  
S Mar 02 (061)  
S Mar 03 (062)  

Notes:

* Significant telemetry shortfalls for the Behind spacecraft are expected
  during the week.

-------------------------------------------------------------------------------
Scheduled activities for Week 10:

M Mar 04 (063)  
T Mar 05 (064)  Ahead:	Test track with Malarque, shadowed by station 55
W Mar 06 (065)  
T Mar 07 (066)  
F Mar 08 (067)  
S Mar 09 (068)  Behind:	Shadow track with Malargue during station 65 track
S Mar 10 (069)  Start of daylight savings time in U.S.

Notes:

* Significant telemetry shortfalls for both spacecraft are expected during the
  week.

* Passage of Comet PanSTARRS through HI1-B, March 10-16

-------------------------------------------------------------------------------
Scheduled activities for Week 11:

M Mar 11 (070)  
T Mar 12 (071)  Ahead:  Station 54 shadow track
		Behind: SECCHI stepped calibration roll, 08:35
W Mar 13 (072)  
T Mar 14 (073)  Behind: Space weather Turbo test, starting 16:00 UT
F Mar 15 (074)  Behind: Space weather Turbo test, ending 13:25 UT
S Mar 16 (075)  
S Mar 17 (076)  

Notes:

* STEREO MOC will be unavailable starting 3:00 PM EDT on Mar 12, and possibly
  through 10 AM EDT on Mar 13, due to maintenance.

* Passage of Comet PanSTARRS through HI1-B, March 10-16

-------------------------------------------------------------------------------
Scheduled activities for Week 12:

M Mar 18 (077)  
T Mar 19 (078)  Ahead:	SECCHI stepped calibration roll, 10:10 UT
W Mar 20 (079)  
T Mar 21 (080)  Ahead:  Momentum dump, 18:00 UT
F Mar 22 (081)  
S Mar 23 (082)  
S Mar 24 (083)  

Notes:

* Significant telemetry shortfalls for the Ahead spacecraft are expected during
  the week.

-------------------------------------------------------------------------------
Scheduled activities for Week 13:

M Mar 25 (084)	Ahead:	PIT test, 15-18 UT
T Mar 26 (085)  
W Mar 27 (086)  
T Mar 28 (087)  Behind:	Momentum dump, 16:30 UT
F Mar 29 (088)  
S Mar 30 (089)  
S Mar 31 (090)  

Notes:

* Significant telemetry shortfalls for the Ahead spacecraft are expected during
  the week

-------------------------------------------------------------------------------
Scheduled activities for Week 14:

M Apr 01 (091)  
T Apr 02 (092)  Both:  Switch to turbo encoding for beacon telemetry
W Apr 03 (093)  
T Apr 04 (094)  Ahead: Return-to-service track for station 54.
F Apr 05 (095)  
S Apr 06 (096)  
S Apr 07 (097)  

Notes:

* Significant telemetry shortfalls for the Ahead spacecraft are expected during
  the week

-------------------------------------------------------------------------------
Scheduled activities for Week 15:

M Apr 08 (098)  
T Apr 09 (099)  
W Apr 10 (100)  
T Apr 11 (101)  
F Apr 12 (102)  
S Apr 13 (103)  
S Apr 14 (104)  

-------------------------------------------------------------------------------
Scheduled activities for Week 16:

M Apr 15 (105)  Ahead: SECCHI watchdog reset, 04:46-18:00 UT
T Apr 16 (106)  
W Apr 17 (107)  
T Apr 18 (108)  
F Apr 19 (109)  
S Apr 20 (110)  
S Apr 21 (111)  

Notes:

* Passage of Comet Lemmon through HI2-A, Apr 17-May 7

-------------------------------------------------------------------------------
Scheduled activities for Week 17:

M Apr 22 (112)  
T Apr 23 (113)  
W Apr 24 (114)  
T Apr 25 (115)  Ahead:	Momentum dump, 19:30 UT
F Apr 26 (116)  
S Apr 27 (117)  
S Apr 28 (118)  

Notes:

* Passage of Comet Lemmon through HI2-A, Apr 17-May 7

-------------------------------------------------------------------------------
Scheduled activities for Week 18:

M Apr 29 (119)  Behind:	SECCHI watchdog reset, 21:33-01:04 next day
T Apr 30 (120)  
W May 01 (121)  Behind: Momentum dump, 17:00 UT
T May 02 (122)  
F May 03 (123)  
S May 04 (124)  Ahead: Switch downlink rate to 120 kbps
S May 05 (125)  

Notes:

* Passage of Comet Lemmon through HI2-A, Apr 17-May 7

-------------------------------------------------------------------------------
Scheduled activities for Week 19:

M May 06 (126)  
T May 07 (127)  
W May 08 (128)  
T May 09 (129)  
F May 10 (130)  
S May 11 (131)  
S May 12 (132)  

Notes:

* Passage of Comet Lemmon through HI2-A, Apr 17-May 7

-------------------------------------------------------------------------------
Scheduled activities for Week 20:

M May 13 (133)  
T May 14 (134)  
W May 15 (135)  
T May 16 (136)  
F May 17 (137)  
S May 18 (138)  
S May 19 (139)  

-------------------------------------------------------------------------------
Scheduled activities for Week 21:

M May 20 (140)  
T May 21 (141)  
W May 22 (142)  
T May 23 (143)  
F May 24 (144)  
S May 25 (145)  
S May 26 (146)  

-------------------------------------------------------------------------------
Scheduled activities for Week 22:

M May 27 (147)  Memorial Day
T May 28 (148)  
W May 29 (149)  Ahead:	Return-to-service track for D43
T May 30 (150)  Ahead:	Momentum dump, 16:30 UT
F May 31 (151)  
S Jun 01 (152)  
S Jun 02 (153)  

-------------------------------------------------------------------------------
Scheduled activities for Week 23:

M Jun 03 (154)  
T Jun 04 (155)  Behind:	Engineering demo with station 26
W Jun 05 (156)  Behind: Momentum dump, 18:30 UT
T Jun 06 (157)  Ahead:	Return-to-service track for D43
F Jun 07 (158)  
S Jun 08 (159)  Ahead:	Return-to-service track for D43
S Jun 09 (160)  Ahead:	Return-to-service track for D43

-------------------------------------------------------------------------------
Scheduled activities for Week 24:

M Jun 10 (161)  
T Jun 11 (162)  Ahead:	SECCHI stepped calibration roll, 08:35 UT
W Jun 12 (163)  
T Jun 13 (164)  
F Jun 14 (165)  
S Jun 15 (166)  Behind: Perihelion
S Jun 16 (167)  

-------------------------------------------------------------------------------
Scheduled activities for Week 25:

M Jun 17 (168)  
T Jun 18 (169)  Behind:	SECCHI stepped calibration roll, 17:00 UT
W Jun 19 (170)  
T Jun 20 (171)  
F Jun 21 (172)  
S Jun 22 (173)  
S Jun 23 (174)  

-------------------------------------------------------------------------------
Scheduled activities for Week 26:

M Jun 24 (175)  
T Jun 25 (176)  
W Jun 26 (177)  Behind: D54 shadow track during D55 pass
T Jun 27 (178)  
F Jun 28 (179)  
S Jun 29 (180)  
S Jun 30 (181)  

Notes:

* Significant telemetry shortages are expected during the week for both
  spacecraft.

-------------------------------------------------------------------------------
Scheduled activities for Week 27:

M Jul 01 (182)  Ahead:	Momentum dump, 16:00 UT
T Jul 02 (183)  
W Jul 03 (184)  Ahead:	Return-to-service track for station 24
T Jul 04 (185)  Independence Day
F Jul 05 (186)  Ahead:	SECCHI watchdog reset, 08:03-12:55 UT
S Jul 06 (187)  
S Jul 07 (188)  

-------------------------------------------------------------------------------
Scheduled activities for Week 28:

M Jul 08 (189)  Behind:	Engineering demo with station 24
T Jul 09 (190)  Ahead:	HGA calibration, 17:00
		Behind:	Engineering demo with station 55
W Jul 10 (191)  Ahead:	Return-to-service track for station 55
		Behind:	HGA calibration, 16:00
T Jul 11 (192)  Behind: Momentum dump, 17:00
F Jul 12 (193)  
S Jul 13 (194)  Behind:	Engineering demo with station 65
S Jul 14 (195)  

-------------------------------------------------------------------------------
Scheduled activities for Week 29:

M Jul 15 (196)  Behind:	Engineering demo with station 25
T Jul 16 (197)  
W Jul 17 (198)  
T Jul 18 (199)
F Jul 19 (200)  
S Jul 20 (201)
S Jul 21 (202)  

Notes:

* DMZ workstation software installation Jul 16, 19-22 UT

* Behind transponder reset, Thursday, Jul 18, 04:27 UT.  Fully recovered by
  01:00 UT on Saturday, Jul 20.  All instruments remained operational taking
  data throughout.

-------------------------------------------------------------------------------
Scheduled activities for Week 30:

M Jul 22 (203)  
T Jul 23 (204)  
W Jul 24 (205)  Behind: PIT test with station 26
T Jul 25 (206)  
F Jul 26 (207)  
S Jul 27 (208)  
S Jul 28 (209)  

-------------------------------------------------------------------------------
Scheduled activities for Week 31:

M Jul 29 (210)  
T Jul 30 (211)  
W Jul 31 (212)  
T Aug 01 (213)  Ahead:	Engineering demo with station 34
F Aug 02 (214)  
S Aug 03 (215)  
S Aug 04 (216)  

-------------------------------------------------------------------------------
Scheduled activities for Week 32:

M Aug 05 (217)  
T Aug 06 (218)  Behind:	Return-to-service track for D63 shadowing D55
W Aug 07 (219)  Ahead:  SECCHI watchdog reset, 9:30-16:08 UT
		Momentum dump, Ahead: 16:30 UT, Behind: 17:00 UT
T Aug 08 (220)  
F Aug 09 (221)  
S Aug 10 (222)  
S Aug 11 (223)  

-------------------------------------------------------------------------------
Scheduled activities for Week 33:

M Aug 12 (224)  
T Aug 13 (225)  Behind: Station 25 pass downlink only
		Behind:	Engineering demo with station 45
W Aug 14 (226)  
T Aug 15 (227)  
F Aug 16 (228)  
S Aug 17 (229)  
S Aug 18 (230)  

-------------------------------------------------------------------------------
Scheduled activities for Week 34:

M Aug 19 (231)  
T Aug 20 (232)  
W Aug 21 (233)  
T Aug 22 (234)  Behind: SECCHI watchdog reset, 17:13 UT
F Aug 23 (235)  Behind: SECCHI observations resume, 16:00 UT
S Aug 24 (236)  
S Aug 25 (237)  

Notes:

* SSH change, Aug 21, 3:00 P.M. EDT

-------------------------------------------------------------------------------
Scheduled activities for Week 35:

M Aug 26 (238)  
T Aug 27 (239)  
W Aug 28 (240)  
T Aug 29 (241)  
F Aug 30 (242)  
S Aug 31 (243)  
S Sep 01 (244)  

-------------------------------------------------------------------------------
Scheduled activities for Week 36:

M Sep 02 (245)  Labor Day
T Sep 03 (246)  Ahead: SECCHI stepped calibration roll, 01:45 UT
W Sep 04 (247)  Ahead: Battery discharge maintenance, 15:00 UT
T Sep 05 (248)  
F Sep 06 (249)  Ahead: Aphelion
S Sep 07 (250)  
S Sep 08 (251)  

-------------------------------------------------------------------------------
Scheduled activities for Week 37:

M Sep 09 (252)  
T Sep 10 (253)  Behind: Momentum dump, 14:00 UT
W Sep 11 (254)  
T Sep 12 (255)  Ahead:  Momentum dump, 15:30 UT
F Sep 13 (256)  
S Sep 14 (257)  
S Sep 15 (258)  

-------------------------------------------------------------------------------
Scheduled activities for Week 38:

M Sep 16 (259)  
T Sep 17 (260)  Behind: SECCHI stepped calibration roll, 08:50 UT
W Sep 18 (261)  Ahead:  Start reduced gyro operations
T Sep 19 (262)  
F Sep 20 (263)  Behind: Attenuator engineering demo using D34
S Sep 21 (264)  
S Sep 22 (265)  

-------------------------------------------------------------------------------
Scheduled activities for Week 39:

M Sep 23 (266)  
T Sep 24 (267)  
W Sep 25 (268)  
T Sep 26 (269)  
F Sep 27 (270)  
S Sep 28 (271)  
S Sep 29 (272)  

-------------------------------------------------------------------------------
Scheduled activities for Week 40:

M Sep 30 (273)
T Oct 01 (274)  NASA MUG upgrade, 15-17 UT (between tracks)  
W Oct 02 (275)  
T Oct 03 (276)  NASA MUG upgrade backup, 12-14 UT (between tracks)
F Oct 04 (277)  Ahead:	IMU test, 14-19 UT
S Oct 05 (278)  
S Oct 06 (279)  

-------------------------------------------------------------------------------
Scheduled activities for Week 41:

M Oct 07 (280)  Ahead:  Attenuator engineering demo using D54, 05:40 UT
T Oct 08 (281)  Behind: 290 degree test roll for Comet ISON, 16-20 UT
W Oct 09 (282)  
T Oct 10 (283)  Ahead:  Comet ISON enters HI2 field-of-view
		Ahead:	Attenuator engineering demo using D34, 20:50 UT
F Oct 11 (284)  
S Oct 12 (285)  
S Oct 13 (286)  

-------------------------------------------------------------------------------
Scheduled activities for Week 42:

M Oct 14 (287)  Ahead:	Attenuator engineering demo using D45, 20:35 UT
T Oct 15 (288)  Behind:	Attenuator engineering demo using D45, 04:30 UT
W Oct 16 (289)  Momentum dumps, Ahead: 14:00 UT, Behind: 15:00 UT
T Oct 17 (290)  
F Oct 18 (291)  
S Oct 19 (292)  
S Oct 20 (293)  

Notes:

* Comet ISON in HI2 field-of-view on Ahead, Oct 10-Nov 23

-------------------------------------------------------------------------------
Scheduled activities for Week 43:

M Oct 21 (294)  
T Oct 22 (295)  
W Oct 23 (296)  
T Oct 24 (297)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
F Oct 25 (298)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
S Oct 26 (299)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
S Oct 27 (300)  

Notes:

* Comet ISON in HI2 field-of-view on Ahead, Oct 10-Nov 23

-------------------------------------------------------------------------------
Scheduled activities for Week 44:

M Oct 28 (301)  Behind: 180 degree roll to observe Comet ISON, 14-18 UT
T Oct 29 (302)  Behind: 180 degree roll to observe Comet ISON, 14-18 UT
W Oct 30 (303)  Behind: 180 degree roll to observe Comet ISON, 14-18 UT
T Oct 31 (304)  Ahead:	SECCHI watchdog reset, 21:25 UT
F Nov 01 (305)  Ahead:	SECCHI observations resume 12:00
S Nov 02 (306)  
S Nov 03 (307)  Daylight savings time ends in U.S.

Notes:

* Comet ISON in HI2 field-of-view on Ahead, Oct 10-Nov 23

-------------------------------------------------------------------------------
Scheduled activities for Week 45:

M Nov 04 (308)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
T Nov 05 (309)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
W Nov 06 (310)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
T Nov 07 (311)  
F Nov 08 (312)  
S Nov 09 (313)  
S Nov 10 (314)  

Notes:

* Comet ISON in HI2 field-of-view on Ahead, Oct 10-Nov 23

-------------------------------------------------------------------------------
Scheduled activities for Week 46:

M Nov 11 (315)  Behind: 180 degree roll to observe Comet ISON, 2-6 UT
T Nov 12 (316)  Behind: 180 degree roll to observe Comet ISON, 10-14 UT
W Nov 13 (317)  Behind: 180 degree roll to observe Comet ISON, 2-6 UT
T Nov 14 (318)  Behind: Momentum dump, 23:00 UT
F Nov 15 (319)  
S Nov 16 (320)  
S Nov 17 (321)  

Notes:

* Comet ISON in HI2 field-of-view on Ahead, Oct 10-Nov 23

* Significant telemetry shortages are expected for both spacecraft during the
  week.

-------------------------------------------------------------------------------
Scheduled activities for Week 47:

M Nov 18 (322)  
T Nov 19 (323)  Ahead:	Momentum dump, 13:30 UT
W Nov 20 (324)  
T Nov 21 (325)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
F Nov 22 (326)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
S Nov 23 (327)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT
S Nov 24 (328)  Behind: 180 degree roll to observe Comet ISON, 6-10 UT

Notes:

* Comet ISON in HI2 field-of-view on Ahead, Oct 10-Nov 23

* Comet ISON in HI1 field-of-view on Ahead, Nov 21-28

-------------------------------------------------------------------------------
Scheduled activities for Week 48:

M Nov 25 (329)  Behind: 180 degree roll to observe Comet ISON, 10-14 UT
T Nov 26 (330)  Behind: 180 degree roll to observe Comet ISON, 10-14 UT
W Nov 27 (331)  
T Nov 28 (332)  Both:  Perihelion passage of Comet ISON
F Nov 29 (333)  
S Nov 30 (334)  Behind: 290 degree roll to observe Comet ISON, 6-10 UT
S Dec 01 (335)  Behind: 290 degree roll to observe Comet ISON, 6-10 UT

Notes:

* Comet ISON in HI1 field-of-view on Ahead, Nov 21-28

* Comet ISON in HI1 field-of-view on Ahead unrolled, Dec 1-7

-------------------------------------------------------------------------------
Scheduled activities for Week 49:

M Dec 02 (336)  Behind: 290 degree roll to observe Comet ISON, 2-6 UT
T Dec 03 (337)  Behind: 290 degree roll to observe Comet ISON, 0-4 UT
W Dec 04 (338)  Ahead:	 30 degree roll to observe Comet ISON, 0-4 UT
		Behind: 290 degree roll to observe Comet ISON, 0-4 UT
T Dec 05 (339)  Ahead:	 30 degree roll to observe Comet ISON, 0-4 UT
		Behind: 290 degree roll to observe Comet ISON, 0-4 UT
F Dec 06 (340)  Ahead:	 30 degree roll to observe Comet ISON, 0-4 UT
		Behind: 290 degree roll to observe Comet ISON, 0-4 UT
S Dec 07 (341)  Behind: 290 degree roll to observe Comet ISON, 2-6 UT
S Dec 08 (342)  

Notes:

* Comet ISON in HI1 field-of-view on Ahead unrolled, Dec 1-7

-------------------------------------------------------------------------------
Scheduled activities for Week 50:

M Dec 09 (343)  Ahead:	 30 degree roll to observe Comet ISON, 2-6 UT
		Behind: 290 degree roll to observe Comet ISON, 2-6 UT
T Dec 10 (344)  Ahead:	 30 degree roll to observe Comet ISON, 2-6 UT
		Behind: 290 degree roll to observe Comet ISON, 2-6 UT
W Dec 11 (345)  Ahead:	 30 degree roll to observe Comet ISON, 2-6 UT
		Behind: 290 degree roll to observe Comet ISON, 2-6 UT
T Dec 12 (346)  Ahead:	Mercury transit, 2:00-7:20 UT
F Dec 13 (347)  Ahead:	SECCHI stepped calibration roll, 04:05 UT
S Dec 14 (348)  
S Dec 15 (349)  

Notes:

* Significant telemetry shortages are expected for the Behind spacecraft during
  the week.

-------------------------------------------------------------------------------
Scheduled activities for Week 51:

M Dec 16 (350)  
T Dec 17 (351)  
W Dec 18 (352)  Behind: Battery discharge cycle, 13:30 UT
T Dec 19 (353)  Momentum dumps: Ahead, 13 UT, Behind 15 UT
F Dec 20 (354)  
S Dec 21 (355)  
S Dec 22 (356)  

-------------------------------------------------------------------------------
Scheduled activities for Week 52:

M Dec 23 (357)  
T Dec 24 (358)  
W Dec 25 (359)  Christmas
T Dec 26 (360)	Behind: SECCHI stepped calibration roll, 13:10 UT
F Dec 27 (361)  
S Dec 28 (362)  
S Dec 29 (363)  

-------------------------------------------------------------------------------

 

Plans last modified Wednesday, 11-Feb-2015 20:05:34 UTC


Last Revised: Tuesday, 08-Jan-2013 19:28:50 UTC
Responsible NASA Official: [email address: Therese.A.Kucera<at>nasa<dot>gov]
Accessibility
Privacy Policy and Important Notices
Feedback and comments: webmaster